Remark:
It is not possible to schedule a report as Semi Monthly and run it on 1st and 16 th of every month. This is because, the schedule does not have an option to specify 2 different run times. Hence, the semi monthly schedule will consider the number of days in the month and split it into two equal halves. If the number of days in the month is 28, then the report will be executed on the 1st and 14 th. For a 30 or 31 day month, it runs on 1st and 16th.

Workaround:

  • Schedule two reports instead of one.
  • The reports should have identical filters.
  • The reports Schedule Type should be monthly.
  • The initial run time should be different, first report getting executed on the 1st and the second report on the 16 th.